Why Are They Spending Trillions on AI?

Research foundation and living reference model  ·  CC BY 4.0

Slide Deck Outline — “Why Are They Spending Trillions on AI?”

Companion deliverable (Release Asset #5) — 26 slides, following the whitepaper’s own Front Matter → Closing structure. Evidence-class tags used throughout: [FACT] = Observed Fact · [ATTR] = Attributed Statement · [CALC] = Derived Calculation · [ASSUMPTION] = Scenario Assumption · [INTERP] = Interpretation.


Slide 1 — Title - “Why Are They Spending Trillions on AI?” — The numbers and economics behind the AI working-capacity revolution - Author: Valto Loikkanen · v1.0 research package · Factual source cut-off 2026-08-13 - Licence: CC BY 4.0 — Attribution 4.0 International - Speaker note: This is a neutral research synthesis, not a vendor report or investment recommendation — state that framing before anything else.

Slide 2 — Method: Five Evidence Classes - Table: OBSERVED FACT (primary source, checked on/before 2026-08-12) · ATTRIBUTED STATEMENT (on-record claim, not auto-proven) · DERIVED CALCULATION (formula always shown) · SCENARIO ASSUMPTION (editable, not a market figure) · INTERPRETATION (labelled reading, never fact) - Every claim in this deck carries one of these five tags, exactly as in the source paper. - No fabricated quotes, figures, or URLs; unverifiable items are labelled UNVERIFIABLE rather than smoothed over. - Speaker note: This slide is the contract with the audience — every number that follows is traceable to one of these five buckets.

Slide 3 — How to Use This Research: Six Equal Lenses - Individual · SME/owner-manager · Finance/infrastructure investor · Government/region/community · AI builder/operator · Educator/researcher/journalist - No lens is prioritized over any other — a deliberate editorial stance held throughout, not an oversight [INTERP, stated editorial policy]. - Each lens has a different entry point into the same chain: energy → hardware → compute → models → tokens → AI working capacity → work → outcomes → value → agency. - Speaker note: Tell the room which lens they’re likely reading from, but stress that the deck deliberately refuses to rank the six.

Slide 4 — Executive Summary: The Chain - Chain: energy → hardware → compute → models → tokens → AI working capacity → digital work → outcomes → value → agency (Front Matter §1). - Parallel physical chain: capital + energy + maintenance + utilisation + orchestration → humanoid working capacity (Part VI). - Headline: Aug 10, 2026 — Nvidia + 6 firms (Apollo, Blackstone, BlackRock, Brookfield, Goldman Sachs, KKR) MOUs to mobilize >$500B [FACT]; Fink: “trillions of dollars over the coming years” [ATTR, Fink]. - Ten-second takeaway: trillions are committed on a belief that cheap AI working capacity is coming — working capacity is not value, and nothing here proves that belief right. - Speaker note: This slide is the whole paper in miniature; everything after it is evidence for or against pieces of this one paragraph.

Slide 5 — Part I: Why Are They Spending Trillions? - Aug 10, 2026: Nvidia signs MOUs with six asset managers/banks to mobilize >$500B in third-party AI-infrastructure capital [FACT, CNBC/Fortune]. - Huang: “each gigawatt is something like $50, $60 billion” [ATTR, Huang]. - Three structurally different, differently-incentivized answers on offer: compute as infrastructure (Huang), intelligence as utility (Altman), superintelligence as personal (Zuckerberg) — shown side by side, none endorsed. - Speaker note: Frame this as the reader’s actual question, not a rhetorical one — three interested parties, three different stakes.

Slide 6 — Three Voices, Side by Side - Table:

Source Framing Representative statement Class
Huang (Nvidia) Compute as infrastructure Chips are an “investable asset” ATTR
Altman (OpenAI) Intelligence as utility “Cost…falls about 10x every 12 months…lower prices lead to much more use” ATTR
Zuckerberg (Meta) Superintelligence as personal “Individual empowerment as the source of prosperity” FACT (verbatim) / ATTR (as claim)

Slide 7 — What Would Need to Be True: Bubble, Infrastructure Transition, or Both? - Supports “transition”: signed $500B MOUs are real [FACT]; independent power-demand forecasts (BCG 50–80GW, S&P Global 64.4GW in 2025) are directionally consistent [ATTR, low-confidence sourcing]. - Supports “bubble caution”: Huang/Fink’s own per-GW and demand figures are self-interested ATTR statements; independent analyst estimates ($35–49B/GW) sit below Huang’s $50–60B [ATTR]. - Disciplined position: both readings draw on overlapping, not competing, facts [INTERP] — the same MOU can be real infrastructure and include mispriced capital. - Speaker note: The point is not to pick a side — it’s to show the same facts support two different narratives simultaneously.

Slide 8: Part II — Electricity, Power, and Tokens per Watt - GB300 NVL72 rack: 135kW TDP / 155kW peak per OEM spec [FACT, Lenovo]; NVIDIA itself publishes no power figure. - MLPerf v6.0: “2.5M tokens/sec” is a 4-rack/288-GPU aggregate, not a single-rack figure — a common misattribution corrected here [FACT]. - Tokens/watt is not one number per chip — it ranges roughly 1.7M–5.2M tokens/sec/MW depending on latency tolerance [CALC/INTERP]. - Speaker note: Use this slide to show the paper’s discipline in action — catching and correcting a benchmark misattribution rather than repeating it.

Slide 9 — Hardware as Capital Equipment, and Its Financing - Huang frames Nvidia’s platform as an “investable asset” [ATTR, Huang, CNBC Aug 10 2026]. - Capital stack observed vs. assumed: DGX Spark $4,699 MSRP [FACT]; HGX B300 has no public price [ASSUMPTION]; GB300 rack ~$4M is an illustrative analyst estimate [ASSUMPTION]. - Depreciation risk: Vera Rubin claimed “up to 10x more tokens/MW” vs GB200 [ATTR, vendor]; SemiAnalysis’s independent figure is 2–5.4x [FACT-adjacent]. - Speaker note: Emphasize that today’s capital is a bet against a hardware curve both the vendor and independent analysts agree is moving fast.

Slide 10 — The Eight Cost Layers (Never Collapsed Into One Number) - Layers: raw energy cost → hardware-amortized cost → financed asset cost → full operating infrastructure cost → capacity/utilisation cost → token production cost → workload/AI-working-capacity cost → outcome and value (never mechanically derived). - Worked EUR example: financing term alone moves cost from €0.688/M tokens to €1.435/M tokens at 50% utilisation [CALC]. - Utilisation is usually the single largest lever at every scale [INTERP, cross-workbook pattern]. - Speaker note: This ladder is the spine of the entire cost analysis — every dollar figure later in the deck sits on one specific rung, never blended with another.

Slide 11 — Owned Production Cost vs. Retail API Price - Self-correction preserved deliberately: retail lab prices are a finished, marked-up product price, not a cost basis for owned hardware [method note]. - Retail benchmark: Claude Sonnet 5 $2/$10 per M tokens [FACT]; GPT-5.6 Terra ~$2/$12 [ATTR, via intermediary fetch]; Gemini 3.1 Pro Preview $2/$12 [FACT]. - Owned production: Home $1.37–$11.89/M tokens (canonical); Hyperscale ~$0.091–0.312/M tokens, canonical full-layer, mid $0.133/M [CALC] — Hyperscale sits 1–2 orders of magnitude below retail; Home sits closer to, and at low utilization inside, the cheapest retail floor. The gap is real everywhere but its size is tier- and utilization-dependent, by design, not error. - Speaker note: This gap is the point, not a mistake to reconcile — “generate your own power” vs. “buy from the grid.”

Slide 12 — Part III: Usage-Intensity Bands - Four bands (tokens/AI-working-hour, all SCENARIO ASSUMPTION): Chat/advisor (10K–30K) · Active copilot (60K–120K) · Delegated agent (200K–600K) · Heavy multi-agent orchestration (1M–12M+). - OpenAI’s own unaudited telemetry: Codex = 99.8% of weekly internal output tokens; 99th-percentile users ran 60+ agent-hours/day [ATTR, OpenAI, self-reported]. - These describe OpenAI staff using OpenAI’s own product — not a general-population statistic [caveat, stated explicitly]. - Orchestration does not create a different kind of hour — it creates multiple working hours in parallel: 1 hour = 1 agent/person × 1h; 10-team hour = 10 agents/people × 1h = 10 agent/human-hours; 1 day = 8 agent/human-hours; 10-team day = 80 agent/human-hours. Team capacity is workers × hours, on both sides, with no exception. - Speaker note: Band 4’s open-ended ceiling is informed by, not proven by, this one company’s internal data. The 1-vs-10 table is the guardrail against reading a band-4 figure as “one very fast hour” instead of “many parallel ordinary hours.”

Slide 13 — From Tokens to $/AI-Working-Hour - Formula: /AI − working − hour = (tokens/hour ÷ 1, 000, 000) × (/M tokens at that tier) [CALC]. - At delegated-agent band, central case: Hyperscale $0.0532/hr vs. Home $1.268/hr vs. Retail-API $3.60/hr [CALC] — a ~68x spread across tiers at the same usage band. - Self-hosting is not automatically the cheapest path — its case rests on control and independence, not undercutting retail [INTERP]. - Speaker note: The spread is arithmetic, not opinion — but which column matters depends entirely on which lens is asking.

Slide 14 — Quality Multipliers and the Limits of Human/AI Comparison - Eight factors shape effective working capacity: capability, reliability, initiative, judgment, creativity, context, tools, information [INTERP, author’s own framework]. - Reliability and information act as multipliers, not add-ons — unreliable capacity caps how much can safely be delegated. - What IS comparable: throughput, marginal cost, capacity elasticity. What is NOT: workload complexity, quality/correctness, supervision burden, context completeness — kept visibly separate, not folded into one multiplier. - The employer/billable split: owned AI pairs with human employer cost (fully loaded — wage+benefits+overhead); retail AI pairs with human billable/externally-purchased rate (agency/contractor/consultancy, which embeds its own margin and overhead on top). Comparing owned AI against a billable rate — or retail AI against employer cost — mixes the internal/external layers exactly as Part III warns against mixing owned-production cost with retail API price [INTERP]. - Speaker note: This is the guardrail slide against naive “$/hour AI vs. $/hour human” headlines — and against the narrower mistake of picking whichever AI number and whichever human number make the best-sounding comparison.

Slide 15 — Part IV: Information as AI’s Operating System - Author’s own framing: information is “the operating system for AI” [FACT that phrase appears; INTERP as underlying claim] — disclosed author interest in this framing (Prifina/Digiole/ValtoAI/PIOS/EIOS). - Same model + different information = very different effective working capacity. - Zuckerberg: “fully private mode…even Meta cannot see” [ATTR]; Altman’s usage anecdote implies ~1,000,000x token growth per heaviest user, 2019→2026 [CALC on ATTR inputs]. - Speaker note: Flag the disclosure here explicitly — this section sits closest to the author’s own commercial stake.

Slide 16 — AI Maturity and the Shifting Human Role - Two axes: how work gets done (Advise → Cowork → Delegate → Lead) and scale of orchestration (individual → team → workforce) [INTERP, author’s framework, partially unverified public form]. - Three framings of the same shift: Altman on freedom/agency [ATTR]; Zuckerberg on balance of power [FACT/ATTR]; Huang on capital allocation [ATTR] — none more correct than the others. - As execution gets cheap, “what should we do” replaces “how do we get it done” as the load-bearing human question [INTERP]. - Speaker note: Each of the six lenses experiences this shift differently — no priority ordering intended.

Slide 17 — Value Can Be Positive, Zero, or Negative - Working capacity ≠ value. Orchestration multiplies capacity, not judgment [INTERP]: “a cheap, fast, wrong answer scaled across a multi-agent team is still cheap and wrong at scale.” - Three human analogies: brilliant professor vs. street-smart entrepreneur; new CEO vs. veteran employee; world-class investor vs. empathetic salesperson — each shows capability ≠ fit ≠ value. - No production tier or ownership architecture is shown by this paper’s evidence to be inherently more likely to produce positive value than another. - Speaker note: This is the hinge slide — everything before it is cost/capacity; everything after assumes this boundary holds.

Slide 18 — From AI Working Capacity to New Value - Conceptual bridge, not a numerical finding [INTERP throughout]: capacity created (Parts I–IV) is not automatically growth, income, or social benefit. - Two separate questions: (1) can the capacity be created — this paper’s cost/utilization model; (2) can that capacity create and capture new value — invention, adoption, trust, revenue model, none of which any $/token figure supplies. - Visual: “Creating Growth Based on New Value” (Diagram 11) — two columns converging on a shared “New Value” band: Idea/Invention → Innovation → Verifying New Value descending on the left; Productivity → Revenue Model → Value Proposition & Communication ascending on the right. - Note: the same boundary applies to any future Scenario Explorer built on this paper’s workbooks — it models cost and capacity, not whether a deployment creates value. - Speaker note: This slide is the second hinge — it stops the room from reading “cheaper tokens” as “more growth” without the missing middle step.

Slide 19 — Part V: The Ownership Stack - Layers, each separately ownable: energy, hardware, compute (access), models, information, agents, identity, governance. - Concentration varies sharply by layer: hardware manufacturing is extremely concentrated [FACT/INTERP]; information is the least standardized/portable layer [INTERP]. - No single actor owns “AI” end to end — ownership questions must be asked layer by layer. - Speaker note: Use this to reframe “who owns AI” as a bad question — it’s really six or seven different questions.

Slide 20 — Six Coexisting Access Models - Table: Centralized platform · Enterprise dedicated (e.g., IBM Cloud/Together AI $240M deal [FACT]) · Open models on owned hardware · Private/individual ownership · Cooperative (€19.50–23/member/month for a DGX Spark pool, or €42/member/month for a shared workstation-class machine — two hardware tiers, not one contested figure [CALC/FACT]) · Local/regional capacity. - None asserted as universally superior — trade-offs differ across scale, cost, privacy, resilience, convenience, control [INTERP]. - Ownership models only make arithmetic sense once usage sits consistently at copilot-band intensity or above [CALC-supported break-even]. - Speaker note: The two cooperative figures describe two different hardware tiers (a DGX Spark pool vs. a shared workstation-class machine), not a discrepancy in one estimate — shown explicitly as a worked example of assumption transparency.

Slide 21 — Electricity-Grid Analogy and Digital Sovereignty Beyond Geography - Analogy: home solar → cooperative → commercial producer → utility-scale plant → grid exchange, mapped onto AI compute tiers [INTERP, author’s own commentary, not independently sourced verbatim]. - Weakest link: no frictionless spot market for AI compute yet exists, unlike electricity or Bitcoin hashrate [FACT/INTERP]. - Sovereignty reframed via five questions: control, portability, exit, governance, continuity — not just server geography [INTERP, framework proposed in this paper]. - Speaker note: Note explicitly that this analogy is the author’s own structural comparison, flagged as such rather than presented as settled.

Slide 22 — Part VI: Scale Scenarios, Tier by Tier - Table: Home ($4,699, $1.37–11.89/M tokens) · Cooperative (~$47K, $1.99–7.62/M) · Professional (unofficial/ASSUMPTION, $0.044–0.146/M, no opex — least evidenced) · Hyperscale (~$16M/4-rack, canonical full-layer $0.091–0.312/M, mid $0.133/M) [CALC throughout]. - Governing levers: utilisation (3.5–4x swing), financing term, interactivity setting — all editable, none a forecast. - Cost-per-hour of capacity is not value — a 500–800x swing between production cost and retail pricing shows how meaningless a bare figure is without its pricing assumption. - Speaker note: State the non-advice boundary explicitly here — every number is a scenario, not a recommendation.

Slide 23 — Humanoid Robots as Embodied Working Capacity - Real market range: Unitree G1 from $13.5K [FACT] to Agility Digit ~$250K [ATTR, secondary]; illustrative €25K base case sits within this spread [INTERP]. - Same utilisation pattern as digital tiers: 2,000→8,000 hrs/yr cuts cost/hour ~3.5–4x [CALC]; electricity is not the binding cost here (unlike token production). - Scope explicitly narrow: excludes supervision, insurance, downtime — every figure is a cost floor, not a full commercial cost. - Speaker note: Flag this as a “later, illustrative extension,” not a general robotics-economics claim.

Slide 24 — Part VII: Six Lenses, Equal Weight, No Ranking - Individual: rent vs. own break-even sits near the copilot band, not chat band. - SME: delivery innovation, not product innovation, is the accessible opportunity [ATTR, author’s prior work]. - Investor/Government/Builder/Educator: same MOU and cost figures, read through different risk lenses — interested-party statements (Huang, Fink) flagged consistently as ATTR, not audited fact. - Speaker note: Reiterate — these are grouped for slide economy only, not because any lens outranks another.

Slide 25 — Closing: Opportunity, Not Inevitability - Capital and infrastructure figures (Parts II–IV) support reading this as opportunity, not destiny [INTERP, editorial choice]. - The unknown variable: adoption, organizational change, and time — not model capability — appear to be the binding constraint [INTERP]. - Closing synthesis: “how do we get it done” is getting cheaper faster than most say plainly; “what should we do” has not gotten any easier at all. - Speaker note: End on the open question, not a resolved answer — the paper deliberately does not decide this for the reader.

Slide 26 — Licence and Attribution - Licensed under CC BY 4.0. Suggested attribution: Research synthesis and modelling by Valto Loikkanen, assisted by AI. - This material is educational research and scenario analysis — not investment, legal, tax, procurement, or policy advice. - Companion workbooks (Global Baseline, AI Working-Capacity Conversion, Token-Factory Scenarios, Investment-Thesis Notes, Humanoid Working-Capacity, Localized/EUR-Finland template) available for readers to rebuild any model with their own inputs. - Speaker note: Close by pointing to the workbooks as the place where the audience can go build their own numbers.


Licensed under CC BY 4.0. Suggested attribution: Research synthesis and modelling by Valto Loikkanen, assisted by AI.